Arizona weather and upkeep

Replacing your roof with solar panels on it

A new roof under solar is routine, but it needs planning between you, the roofer and a solar company. Here is how a remove and reinstall works and what to watch for.

5 min readUpdated November 2026From the Energy Solution Providers service team

The short answer

The panels and racking come off, the roofer does the roof, then the system goes back on with new seals at every mount and is tested. Ours start from $100 a panel plus any materials.

How a remove and reinstall works

  1. We check the system firstBefore anything comes off, we test the system and record how each part is producing. If something is already faulty, you know before the roof work, not after.
  2. Shut down and removeWe shut the system down safely, disconnect and label the wiring, and remove the panels and racking. Panels are stored safely, usually on site.
  3. The roofer does the roofThe roofer replaces the roof as normal. We agree with them where the mounts will go, and leave the roof clear for them.
  4. New mounts and flashingWe install the mounts with new flashing and seals so they are watertight with the new roof. On tile roofs, cracked or brittle tiles around the mounts are replaced as needed.
  5. Reinstall and testThe racking and panels go back on, the wiring is reconnected, and the system is tested panel by panel. We make sure the monitoring is reporting before we leave.

What it costs

Our remove and reinstall starts from $100 a panel, plus any materials needed, such as new flashing, replacement tiles or connectors. Estimates are free. The price depends on the number of panels, the roof type and pitch, and whether parts need replacing.

Tip. Ask your roofer whether their quote includes the solar. Some roofers add a solar company's price to theirs. Getting a separate quote from us can cost less, and means the solar is handled by people who work on it every day.

How long it takes

  • Removal: usually one day.
  • The roof: however long your roofer needs, often a few days.
  • Reinstall and testing: usually one to two days.

While the panels are off, the system is not making power, so your bills will be higher for that time. Spring and fall, outside the peak cooling months, are good times to plan a roof.

Agree these before work starts

  • Who does what. The roofer handles the roof. A licensed solar contractor handles the panels, wiring and mounts.
  • The schedule. When the panels come off, when the roof is done, and when they go back on.
  • Where the panels are stored. Somewhere safe from the roof work and from foot traffic.
  • Leases and warranties. If the system is leased, the leasing company may need to approve or arrange the work. Panel and racking warranties may require a licensed solar contractor.
  • Permits. Some cities require a permit for removing and reinstalling solar. We check and handle it.

Worth doing while the panels are off

  • Pigeon guards. The easiest time to fit mesh around the array. See pigeons under solar panels.
  • Replace aging parts. If the inverter is old or out of warranty, replacing it at the same time saves a separate visit.
  • Clean the panels. They are at ground level, so it is quick.
  • Add panels. If your use has gone up, it is a good time to talk about adding to the system.

Planning a new system on an older roof?

If your roof is near the end of its life, it is usually cheaper to replace it before solar goes on than to remove and reinstall the panels a few years later. We look at the roof as part of every quote and will tell you honestly if it should come first.

Questions people ask

Can the roofer take the panels off?

We do not recommend it. Removing and reconnecting solar is electrical work, and mistakes with connectors, wiring or roof mounts often show up later as faults or leaks. The panel and racking warranties may also need a licensed solar contractor.

My system is leased. What do I do?

Call the leasing company first. Most leases say who may work on the system, and some arrange the remove and reinstall themselves.

This guide is general advice for Arizona homeowners. Your equipment's manual has the final word, and anything inside the inverter, on the roof or in the electrical panel is a job for a licensed contractor.

Accredited, award-winning and Arizona licensed

AriSEIA member — Arizona Solar Energy Industries AssociationHomeAdvisor Top RatedHomeAdvisor Elite Service awardBetter Business Bureau accredited business, A+ ratingSolarReviews — read our customer reviewsAngi Super Service Award 2023Angi Super Service Award 2022
Call us Text Get a free quote

Type at least two letters.